Hse Manager, Data Center Construction

Crusoe · Data AI · Dallas, TX - US · Environmental, Health and Safety (EHS)

The company is an AI infrastructure company focused on energy and intelligence, aiming to accelerate AI workloads. This role is for an HSE Manager for Data Center Construction, responsible for safety, risk assessment, compliance, and fostering a safety culture across construction projects. The role requires extensive experience in HSE regulations and practical implementation, particularly in mission-critical builds.

What you'd actually do

  1. Partner closely with the Digital Infrastructure Group director of safety and overall DIG safety team to understand operational risks and develop concrete action plans to effectively address them.
  2. Cultivate a high level of HSE awareness and a strong safety culture through consistent communications, targeted training, and promotion of active involvement in all HSE programs.
  3. Conduct thorough assessments of worker risks and provide actionable recommendations to reduce exposure and enhance safety.
  4. Develop and implement various HSE processes, procedures, work instructions, and checklists, ensuring clear guidelines for safe operations.
  5. Actively monitor compliance with all relevant regulations, internal policies, and established procedures, and regularly report on HSE objectives and key metrics.

Skills

Required

  • HSE management
  • Risk assessment
  • Regulatory compliance
  • Safety culture development
  • Construction safety
  • Data center construction
  • Oil and Gas safety
  • Commercial construction safety
  • Heavy civil safety
  • Mission critical operations safety
  • Steel erection safety
  • Electrical safety
  • Mechanical safety
  • NFPA 70E
  • Communication skills
  • Computer proficiency
  • US work authorization

Nice to have

  • University degree in Occupational Safety, Environmental Science, or Engineering
  • CSP certification
  • ASP certification
  • CHST certification
  • Experience in a fast-paced, high-growth company
  • Ability to drive cultural change

What the JD emphasized

  • Minimum of 10+ years of relevant industry experience
  • strong preference for backgrounds in data center construction, Oil and Gas, commercial construction, heavy civil, or other mission critical operations
  • deep technical knowledge of various HSE rules and regulations at both the Federal and State levels
  • Proven direct experience with the practical implementation of HSE rules, regulations, policies, and procedures in an operational environment
  • Excellent communication skills, both written and verbal
  • Proficient computer skills for documentation, reporting, and utilizing HSE management systems
  • Must be able to legally work and reside in the US without requiring sponsorship
  • This position is designated a safety-sensitive position and/or is located in a safety-sensitive facility. Drug and alcohol program participation is required.