Principal Data Center Commissioning Facilities Development Manager

Oracle Oracle · Enterprise · United States

This role is for a Principal Data Center Commissioning Facilities Development Manager at Oracle Cloud Infrastructure (OCI). The manager will be responsible for the end-to-end commissioning strategy and execution of OCI data centers, ensuring critical infrastructure systems are safe, compliant, and ready for production. Key responsibilities include developing commissioning plans, leading Integrated Systems Testing (IST), coordinating with various teams (Engineering, Construction, etc.), managing vendors, and driving handover to operations. The role requires experience in commissioning mission-critical facilities, particularly electrical and mechanical systems, and understanding of relevant codes and best practices. Experience with GPU/high-density data halls and operational readiness is preferred.

What you'd actually do

  1. Own end-to-end commissioning strategy and execution across one or more data center projects, ensuring consistent, repeatable outcomes.
  2. Lead development and governance of key Cx deliverables: Cx plans, test scripts/procedures, checklists, IST plans, MOPs/SOPs, and turnover packages.
  3. Coordinate and drive Integrated Systems Testing (IST), including planning, prerequisites, execution oversight, defect tracking, and retest closure.
  4. Ensure system readiness across major infrastructure domains: MEP, EPMS, BMS/controls, generators, UPS, switchgear, chillers/cooling plants, containment, and associated alarms/monitoring.
  5. Manage and communicate commissioning milestones, constraints, risks, and blockers to leadership and cross-functional teams.

Skills

Required

  • Bachelor’s degree in Engineering, Construction Management, or related field (or equivalent practical experience).
  • Significant experience commissioning mission-critical facilities (data centers strongly preferred), including electrical and mechanical systems.
  • Demonstrated ability to lead commissioning through: Functional testing, IST planning/execution, Energization and start-up coordination, Turnover and operational acceptance
  • Strong understanding of: Critical electrical systems (UPS, generators, switchgear, ATS/STS, grounding), Cooling systems (chillers/CDUs, CRAH/CRAC, pumps, heat rejection), Controls/monitoring (BMS, EPMS, alarms, trending)
  • Experience working with contractors, commissioning agents, and vendors; ability to drive outcomes through influence.
  • Strong documentation and communication skills; comfort presenting to executive and technical audiences.
  • Working knowledge of applicable codes/standards and commissioning best practices (e.g., ASHRAE guidance, local AHJ requirements).

Nice to have

  • Direct commissioning experience supporting GPU/high-density or liquid-cooled data halls (CDUs, leak detection, controls integration).
  • Experience commissioning hyperscale or multi-site programs with standardized Cx playbooks and repeatable processes.
  • Professional certifications: CxA/CCP (commissioning), PMP, PE, LEED (as applicable).
  • Experience with digital commissioning tools and platforms (e.g., field QA/QC and punch management systems).
  • Strong background in operational readiness, including runbooks, MOP/SOP development, and operator training.
  • Familiarity with reliability validation practices and redundancy testing (N, N+1, 2N) and maintenance bypass scenarios.

What the JD emphasized

  • Integrated Systems Testing (IST)
  • operational handover
  • GPU/rack readiness milestones
  • commissioning (Cx) lifecycle
  • safe, reliable, testable, and ready for production
  • commissioning strategy and execution
  • commissioning plans, test scripts/procedures, checklists, IST plans, MOPs/SOPs
  • Integrated Systems Testing (IST)
  • MEP, EPMS, BMS/controls, generators, UPS, switchgear, chillers/cooling plants, containment
  • milestones, constraints, risks, and blockers
  • commissioning vendors/agents and contractors
  • safety and compliance culture
  • commissionability
  • Factory witness testing (FWT)
  • Level 1–5 (or equivalent) commissioning stages
  • Equipment start-up and functional performance testing (FPT)
  • IST and operational scenarios
  • prerequisite discipline
  • log defects, assign owners, prioritize by risk/criticality, track to closure, and validate retests
  • handover to Operations
  • owner design intent